Profitality Labor Guru LLC

Miami,  FL 
United States
http://www.laborguru.com
  • Booth: 1472


Industrial Engineering, Labor, Design, Efficiency,Operations

Labor Management Solution for Restaurants.

  • Right Labor in the Right Place at the Right Time
  • Bottoms Up Approach to all labor activities
  • Labor Productivity Measurements
  • Detailed Activity List
  • Labor Standards
  • Labor Guidelines
  • Deployment Maps
  • Integration into scheduling software
  • Schedule Optimization
  • Field Testing
  • Integration into back office (HotSchedules, Crunchtime, TMx, RTI, MBO, MenuLink, and many more)
  • Staffing Matrices, SPLH, SPMH, GPLH

Prototype facility design. Not just kitchen design, the optimal design. Comprehensive resource optimization:

  • Optimized New Prototype for Brand Growth
  • Reduction in Facility Size & Capital Costs
  • Reduction in Operating Costs (labor, food cost, utilities)
  • Improvement in Labor Efficiency
  • Reduction in Peak Staffing Deployment Levels
  • Storage Design, Capacity and Modeling
  • Equipment Capacity
  • Dining Room table configuration
  • Bottleneck Reduction
  • Throughput increase
  • Bar Design
  • Kitchen Design
  • Mockup Testing

Retrofit facility design.

  • Low, Medium and High Retrofit Investment Solutions
  • Platform Equipment Re-Design
  • Labor Deployment Re-Engineering
  • Equipment Utilization Analysis
  • Objectively redesign the existing line to improve execution of current or future menu

Other Services

  • Computer Simulation (Simio, Arena)
  • Spreadsheet modeling (food cost model, storage model, labor model, ideal ordering models, etc)
  • Detailed Process Mapping
  • Process Variance Analysis
  • Bottleneck & Order Delay Analysis

Private Equity restaurant acquisition due diligence support

Industrial engineering consulting and outsourcing.

Brands: Starbucks, Chick-fil-A, Carrabbas, Captain D's, Checker's, KFC, Outback, Arby's, Famous Dave's, Dunkin Donuts, Qdoba, Corner Bakery, Schlotszky, Cracker Barrel, Dominos, Sweetgreen, Nando's, Newk's


 Products

  • Simulation Modeling
    3D simulation modeling with live operational parameters...

  • COMPUTER SIMULATION

    Utilizing the latest technology in 3D computer simulation to create models of any operating conditions

    There are many methods of modeling systems which do not involve simulation but provide a deterministic solution. Simulation is recommended when 1) the model is very complex with many variables and interacting components; 2) the underlying variables relationships are nonlinear; 3) the model was random elements 4) the model output is to be visual as in a 3D computer animation. The power of simulation is that once a model is built to replicate an actual system, creating what if scenarios is very economical. Also testing options that might be too risky or expensive for the brand with real guests are also options.

     Drive thru stack size alternatives 
     Multi lane vs single lane drive thru 
     Front counter register options 
     Kitchen capacity modeling 
     Monitor / ticket routing options 
     Labor staffing options and alternatives

    https://www.youtube.com/embed/TYcKcu5C4g0

  • Prototype Facility Design
    Reduction in Facility Size & Capital Costs
    Reduction in Operating Costs (labor, food cost, utilities)
    Improvement in Labor Efficiency...

    • Reduction in Facility Size & Capital Costs
    • Reduction in Operating Costs (labor, food cost, utilities)
    • Improvement in Labor Efficiency
    • Reduction in Peak Staffing Deployment Levels
    • Capacity Analisys
    • Resource “Right sizing” (front and back of house)
    • “Green” Equipment Options (“Star” rated)
    • “Green” Process & Station Designs (Employee Ergonomics)
    • Improvement in Customer Service
    • Increase in Sales Throughput
    • Improvement in Product Quality
    • Increase Unit Profitability & Return On Investment








  • LABOR MANAGEMENT
    Labor management systems are needed to control labor costs, they also improve operations, which translates into a better guest experience. You may already have a labor management software, Labor Guru can make it work...

  • LABOR MANAGEMENT SYSTEM - PROCESS

    "The right labor in the right place at the right time"
    To deliver optimum customer service 

     
    1. MEASURE
    All activities are documented and
    classified
    2. QUANTIFY
    Labor standards are developed for all service and non -service tasks
    3. CALCULATE
    Store specific guidelines are calculated for hourly and dailyneeds
    4. TEST & VALIDATE
    Actual vs. 
    Guide Daily Hrs 

    The guides are tested to ensure labor savings and improved service!
    5. IMPLEMENT
    Integration to all back of the house systems to optimize their outputs

 Additional Info

Exporter?
Yes
For Technical Support with this webpage, please contact support.